BLAUBERG-LOGO

BLAUBERG CDTE E3.0 TP Speed Controller

BLAUBERG-CDTE-E3.0-TP-Speed-Controller-PRODUCT

Akwụkwọ ntuziaka onye ọrụ a bụ akwụkwọ na-arụ ọrụ nke ezubere maka teknụzụ, ndozi na ndị ọrụ na-arụ ọrụ.

  • The manual contains information about the purpose, technical details, operating principle, design, and installation of the CDTE E .. TP unit and all its modifications.
  • Technical and maintenance staff must have theoretical and practical training in the field of ventilation systems and should be able to work in accordance with workplace safety rules as well as construction norms and standards applicable
  • in the territory of the country.

Nzube

  • Electric fan speed controllers of the CDTE E .. TP series are designed for single-phase motors with a control voltage of up to 10 A.
  • Ike ọkọnọ voltage is determined by the controller automatically (110-240 VAC / 50-60 Hz).
  • The motor speed can be regulated manually with a handle, ranging from the lowest to the highest.
  • The controllers have a 230 VAC output for an air damper actuator, water valve actuator, etc.
  • Electronic controllers of the CDTE E .. TP series also have an ON / OFF switch and enable soft or quick start of the motor.

ỌTỤTỤ ebugharị

  • Speed controller 1 pc.
  • Akwụkwọ ntuziaka onye ọrụ 1 pc.
  • Igbe nkwakọ ngwaahịa 1 pc.

Data nka nka

BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (1)

Nhazi na ụkpụrụ ịrụ ọrụ

  • All series CDTE E .. TP speed controllers regulate the rotational speed of single-phase motors by changing the power supply voltage, which is done by adjusting the phase angle.
  • The power supply source is determined by the controller automatically. The minimum speed can be controlled by means of an internal trimmer.
  • The output is controlled by means of a potentiometer in the range between the minimum output voltage na ọkọnọ voltage. The controller has an unregulated output for connecting actuators for valves, bulbs etc.
  • The controller has two starting modes: quick start and soft start, which can be selected by putting or removing the jumper from the printed circuit board.
  • The device is only rated for indoor use.

Nwụnye na nhazi

  • The controller is installed indoors.
  • Installation must be carried out in a way that ensures free air recirculation, which cools down the inner elements.
  • Do not install the controller above heating equipment or in areas with insufficient air convection.

Ịdọ aka ná ntị! Before the initial power-up after transportation or storing at negative temperatures, keep the unit in appropriate operation conditions for at least 4 hours.

  • Visually inspect the unit to ensure the casing is intact and not damaged.
  • A ga-enwerịrị ihe nbibi sekit arụnyere n'ime wiwi kwụ ọtọ.

Ntuziaka ntinye

  1. Unscrew and take off the front cover, and open the casing.
    • Be careful with the wires connecting the potentiometer to the printed circuit board
  2. Open the cover and secure the controller on the wall or panel with the screws and dowels from the delivery set. Pay attention to the correct installation position and mounting dimensions of the device.BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (2)

Akụkụ ngwaahịa

BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (3)

BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (4)

Ngwaahịa gafereview

  1. Insert the cables into the cable glands and lay the wiring according to the wiring diagram.
  2. Connect the motor/fan.

Connect the power supply terminals.

  1. Connect the unregulated output if necessary.
  2. It can be used for powering a valve, bulb, etc.
    1. Ịdọ aka ná ntị!
  3. Before connecting the device, make sure it is properly connected, and cables of appropriate diameter are used.
  4. Set a minimum speed using a trimmer (if necessary). Factory settings: 45%.BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (5)
  5. Select a start mode (quick or soft) using a jumper. Factory settings: “Quick start enabled”; to disable it, remove the jumper. The duration of a quick or soft start is 8-10 sec.BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (6)
  6. Put the cover back and secure it with screws. Tighten the cable glands.

Njikọ waya

njikọ na isi ike

  • Ịdọ aka ná ntị! To switch off the ON / OFF switch (for 1.5 A & 3.0 A versions only!), connect the 230 VAC power supply to the unregulated output (L1). If this is the case, do not connect the power supply unit to L.BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (7)
  • 1 – terminal block; 2 – fuse; 3 – jumper for selecting the start mode; 4 – minimum speed trimmer.
  • L – Input voltage; N – Neutral; L1 – Unregulated output; PE – Grounding terminal; U2 – Regulated motor output – phase; U1 – Regulated output for the motor.
  • Connection – Cable cross section: at most 2.5 mm2. The cable gland tightening range: 5–10 mm.

Nchọpụta nsogbu

BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (8)

Ịdọ aka ná ntị! Use fuses of the type and rating specified above.

Iwu nchekwa na mbufe

  • Store the unit in the manufacturer’s original packaging box in a dry, closed, ventilated premise witha temperature range from -40 ˚C to +50 ˚C and relative humidity up to 70 %.
  • Ebe nchekwa ebe nchekwa agaghị enwe nnukwu vapors na ngwakọta kemịkalụ na-akpasu corrosion, mkpuchi, na nrụrụ akara.
  • Jiri igwe hoist kwesịrị ekwesị maka njikwa na ọrụ nchekwa iji gbochie mmebi nke unit ahụ nwere ike ime.
  • Soro njikwa ihe achọrọ maka ụdị ibu ahụ.
  • Enwere ike iburu unit ahụ na nkwakọ ngwaahịa mbụ site na ụdị ụgbọ njem ọ bụla, nyere nchebe kwesịrị ekwesị megide mmiri ozuzo na mmebi igwe. A ghaghị ibugharị unit ahụ naanị n'ọnọdụ ọrụ.
  • Zenarị ihe ọkụkụ dị nkọ, ncha, ma ọ bụ njikwa ike mgbe ị na-ebu na ebutu.
  • Tupu ịmalite ike mbụ mgbe njem na obere okpomọkụ, kwe ka unit ahụ kpoo ọkụ na okpomọkụ na-arụ ọrụ ma ọ dịkarịa ala awa 3-4.

NKWUKWU

NKWUKWU NDỊ emepụta ihe

  • Ngwaahịa a na-akwado ụkpụrụ EU na ụkpụrụ na obere voltajitage guidelines and electromagnetic compatibility. We hereby declare that the product complies with the provisions of Electromagnetic Compatibility (EMC)
  • Directive 2014/30/EU of the European Parliament and of the Council, Low Voltage Directive (LVD) 2014/35/EU of the European Parliament and of the Council, and CE-marking Council Directive 93/68/EEC. This certificate is issued following the test carried out on samples nke ngwaahịa a kpọtụrụ aha n'elu.
  • The manufacturer hereby warrants normal operation of the unit for 24 months after the retail sale date, provided the user’s observance of the transportation, storage, installation, and operation regulations.
  • Should any malfunctions occur in the course of the unit operation through the Manufacturer’s fault during the guaranteed period of operation, the user is entitled to get all the faults eliminated by the manufacturer by means of warranty repair at the factory free of charge.
  • The warranty repair includes work specific to the elimination of faults in the unit’s operation to ensure its intended use by the user within the guaranteed period of operation. The faults are eliminated by means of replacement or repair of the unit components or a specific part of such unit components.
  • Ndokwa akwụkwọ ikike anaghị agụnye:
    • na-arụ ọrụ teknụzụ oge niile
    • otu nrụnye / ikpochapụ
    • nhazi unit

Iji rite uru na nrụzi akwụkwọ ikike, onye ọrụ ga-enyerịrị unit ahụ, akwụkwọ ntuziaka onye ọrụ na ụbọchị ịzụrụ stamp, na akwụkwọ ịkwụ ụgwọ na-akwado ịzụrụ. Ụdị otu ahụ ga-agbasorịrị nke ekwuru n'akwụkwọ ntuziaka onye ọrụ. Kpọtụrụ onye na-ere ere maka ọrụ akwụkwọ ikike.

Akwụkwọ ikike nke onye nrụpụta anaghị emetụta ikpe ndị a:

  • Ọdịda onye ọrụ inyefe otu ngwungwu nnyefe niile dịka ekwuru na ntuziaka onye ọrụ, gụnyere nrubeisi nwere akụkụ ndị na-efu efu nke onye ọrụ bupụrụ na mbụ.
  • Ndakọrịta nke ụdị otu na aha aha ya na ozi ekwuru na nkwakọ unit yana na akwụkwọ ntuziaka onye ọrụ.
  • Ọdịda nke onye ọrụ iji hụ na mmezi teknụzụ nke ngalaba ahụ n'oge.
  • Mmebi na casing unit yana ihe dị n'ime nke onye ọrụ kpatara.
  • Ndozigharị ma ọ bụ injinia na-agbanwe na unit ahụ.
  • Ndochi na ojiji nke mgbakọ ọ bụla, akụkụ na ihe ndị nrụpụta akwadoghị.
  • Eji otu nkeji eme ihe n'ụzọ na-ezighị ezi.
  • Mmebi iwu nrụnye unit site n'aka onye ọrụ.
  • Mmebi iwu njikwa otu nke onye ọrụ.
  • Njikọ otu n'ime eriri ọkụ nwere voltage dị iche na nke ekwuru na akwụkwọ ntuziaka onye ọrụ.
  • Mmebi nke otu n'ihi voltage surges na ike mains.
  • Ndozi ezi uche nke otu ahụ site n'aka onye ọrụ.
  • Ndozi otu nke onye ọ bụla na-enweghị ikike onye nrụpụta.
  • Mkpebi nke oge akwụkwọ ikike otu.
  • Mmebi iwu njem otu unit site n'aka onye ọrụ.
  • Mmebi iwu nchekwa otu nke onye ọrụ.
  • Omume ọjọọ megide unit nke ndị ọzọ mere.
  • Ndakpọ nke otu n'ihi ọnọdụ nke ike enweghị oke (ọkụ, idei mmiri, ala ọma jijiji, agha, ọgụ n'ụdị ọ bụla, mgbochi).
  • Akara na-efu efu ma ọ bụrụ na enyere ya site na ntuziaka onye ọrụ.
  • Ọdịda ịnyefe akwụkwọ ntuziaka onye ọrụ yana ụbọchị ịzụrụ otu stamp.
  • Akwụkwọ ugwo na-efu efu na-akwado ịzụrụ otu.

Ịgbaso iwu ndị edepụtara n'ebe a ga-eme ka ọ dị ogologo na nsogbu na-enweghị nsogbu nke Unit.

Mkpesa akwụkwọ ikike nke onye ọrụ ga-edobere n'aka REVIEW Naanị n'ihu ọha nke Unit, akwụkwọ ugwo na akwụkwọ ntuziaka onye ọrụ na ụbọchị ịzụrụ ST.AMP.BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (9)

Ozi ndị ọzọ

BLAUBERG-CDTE-E3-0-TP-Speed-Controller-FIG- (10)

FAQ

Q: How should I store and transport the product?

A: The product should be stored and transported in a dry place for at least 3-4 hours.

Ajụjụ: Kedu ihe m ga-eme ma ọ bụrụ na enwere m akwụkwọ ikike?

A: User's warranty claims will be subject to review only upon presentation of the unit, the payment document, and the user's manual with the purchase date stamp.

Akwụkwọ / akụrụngwa

BLAUBERG CDTE E3.0 TP Speed Controller [pdf] Akwụkwọ ntuziaka onye ọrụ
CDTE E3.0 TP Speed Controller, CDTE E3.0 TP, Speed Controller, Controller

Ntụaka

Hapụ ikwu

Agaghị ebipụta adreesị ozi-e gị. Akara mpaghara achọrọ akara *