Okwu mmalite
This manual provides detailed instructions for the assembly, operation, and maintenance of your Outsunny 7' x 4' Outdoor Storage Shed. Designed for efficient outdoor storage, this shed features a galvanized steel frame, double sliding doors, and integrated vents. Please read all instructions carefully before beginning assembly and retain this manual for future reference.
The shed is designed with horizontal wall panels for streamlined assembly, enhanced stability with seven support columns, and includes a foundation kit for a clean and sealed interior. The double sliding doors offer smooth access, and a padlock is included for security. Its compact 7' x 4' footprint provides ample storage without occupying excessive yard space.
Ntọala na Mgbakọ
Ihe ndetu nchekwa dị mkpa: Always wear gloves during assembly. Do not assemble in windy weather. For alignment of holes, do not tighten screws until fully assembled.
Ngwa achọrọ: An electric drill, a ladder, and other tools mentioned in the manual are recommended.

Image: Initial assembly steps highlighting safety precautions and tool requirements.
- Ndepụta nleba anya tupu mgbakọ: Before starting, ensure all parts are complete and undamaged. Refer to the parts list provided in your package.
- Mgbakọ Frame ntọala: Connect the base frame components (e.g., K46-1L, K68-1R, K46-2, T-F) using the provided screws (F1). Ensure diagonal distances are consistent for a square base.
- Nwụnye Panel: Mount the side panels (e.g., W5-C) onto the base frame using screws (F1). Assemble columns first, then wall panels from bottom to top.
- Top Frame Assembly: Connect the top frame fittings (e.g., K46-3) and link them with the side panels using screws (F1).
- Nwụnye panel n'azụ: Install the rear panels (e.g., W5) onto the K46-4 frame, ensuring flat-edged sheets are placed on top of fluted edges where they overlap. Secure with screws (F1, F2).
- Nwụnye Panel n'ihu: Install the front panels (e.g., W3) onto the K46-4 frame, following the same overlap principle as the rear panels. Secure with screws (F1, F2).
- Ntinye Panel Ụlọ: Install the shed top frame (V2) and then the roof panels (e.g., K46-7L, K46-7M, K46-7R) in the specified order. The first piece of tin at the top needs to extend beyond the wall by approximately 2.4 inches when installed. Secure with screws (F1, V2). Install K46-8 and K46-9 around the roof, and K46-10 at the highest part. Install corner pieces (GC) on the four corners of the roof.
- Mgbakọ ọnụ ụzọ: Combine the door panels (e.g., W5-K, W2-HL) to create the left and right doors. Install the latch (DC), hinges (DH), and door lock (GL) in their designated positions using screws (F1, F3).
- Ntinye ọnụ ụzọ: Mount the assembled doors to the door frame using screws (F3).
- Mmetụ ikpeazụ: Install protective caps (SL) for any exposed screws to ensure a neat finish and prevent injury.
Video: General assembly overview for an Outsunny storage shed, demonstrating various construction stages.

Image: Apex roof design ensuring efficient water runoff.
Ntuziaka ọrụ
Your Outsunny storage shed is designed for ease of use and security.
- Ọnụ ụzọ na-amị amị: The shed features double sliding doors for smooth and wide access. Gently slide the doors along their tracks to open and close.
- Ọnụ ụzọ akpọchiri: Use the included padlock to secure the doors, keeping your tools and equipment safe.
- Igwe ikuku: The integrated vents promote air circulation, helping to prevent moisture buildup and maintain a fresh interior environment.
- Ramp: A small ramp is integrated for easy movement of wheeled equipment such as lawnmowers or wheelbarrows.

Image: Double sliding doors with lock and ramp maka ohere dị mma.
Nlekọta
Ịrụzi ihe mgbe niile ga-eme ka ebe nchekwa gị dị ogologo ma rụọ ọrụ nke ọma.
- Nhicha: Clean the exterior and interior of the shed periodically with mild soap and water. Avoid abrasive cleaners that could damage the galvanized steel finish.
- Ihe nkwụnye: Periodically check all screws and fasteners to ensure they are tight. Re-tighten as necessary to maintain structural integrity.
- Ụzọ egwu ụzọ: Keep the sliding door tracks clear of debris to ensure smooth operation. Lubricate if needed.
- Ibu snoo: The shed is designed with a snow-bearing capacity of 30 kg/m³. In areas with heavy snowfall, it is advisable to clear excessive snow from the roof to prevent potential damage.
- Igwe ikuku: Ensure the vents remain unobstructed to allow for proper air circulation and prevent condensation.

Image: Shed's snow-bearing capacity and structural support.
Nchọpụta nsogbu
If you encounter any issues with your shed, refer to the following common problems and solutions:
- Doors are Sticking: Check the door tracks for any debris or obstructions. Clean the tracks and apply a silicone-based lubricant if necessary. Ensure the shed is level and the frame is square.
- Mgbapu mmiri: Verify that all roof panels are correctly overlapped and all screws are tightened. Ensure the foundation is properly sealed and any gaps are filled.
- Enweghi ike: Confirm that all frame components and panels are securely fastened. Ensure the shed is placed on a firm, level surface and anchored if required by local building codes.
- Akụkụ na-efu: If any parts are missing or damaged upon arrival, please contact customer support immediately.
Nkọwapụta
| Njirimara | Nkọwa |
|---|---|
| Nọmba nlereanya | 84H-225V00CG |
| Ụdị | Ọpụpụ |
| Akụkụ ngwaahịa | 120 x 213 x 194 cm (47.2 x 83.9 x 76.4 inch) |
| Ibu Ibu | 54.88 n'arọ (121 pound) |
| Ihe onwunwe | Galvanized ígwè |
| Agba | Ọchịchịrị Grey |
| Ụdị ụzọ | Ọnụ ụzọ na-amị amị |
| Ọkwa Nguzogide mmiri | Waterproof |
| Mgbakọ chọrọ | Ee |
| Atụmatụ pụrụ iche | Foundation Kit, 7 Support Columns, 2 Lockable Doors, Vents, Apex Roof |

Image: Detailed dimensions of the shed.
Akwụkwọ ikike na nkwado
This product is eligible for return or refund within 30 days of receipt. For any questions, concerns, or to report missing/damaged parts, please contact Outsunny customer support. Contact information can typically be found on the product packaging or the retailer's websaịtị.





