Okwu mmalite
This manual provides essential information for the proper installation, operation, and maintenance of your Berg Drain Valve, Model 04.002.006. This genuine OEM (Original Equipment Manufacturer) part is designed for use with Bim-350H, Bim-350F, Bim-529H, and Bim-500F systems. Please read this manual thoroughly before installation and use to ensure safe and efficient operation.
Ozi nchekwa
Na-edebe nchekwa nchekwa ndị a mgbe niile iji gbochie mmerụ ahụ ma ọ bụ mebie akụrụngwa:
- Ensure the system is depressurized and drained before attempting installation or maintenance.
- Yiri akụrụngwa nchekwa nkeonwe kwesịrị ekwesị (PPE), dị ka uwe aka na nchebe anya.
- Refer to the primary equipment's service manual for specific instructions related to the system where this valve will be installed.
- Do not modify the valve in any way. Use only genuine Berg replacement parts.
- If you are unsure about any procedure, consult a qualified technician.
Ngwaahịa gafereview
The Berg Drain Valve (Model 04.002.006) is a critical component designed to facilitate the controlled drainage of fluids from compatible systems. It features a robust construction suitable for industrial applications.

Foto 1: N'ihu view of the Berg Drain Valve, showing the main body and electrical connector.

Foto 2: Akụkụ view of the Berg Drain Valve, highlighting the electrical connection points and mounting bracket.

Foto 3: Top view of the Berg Drain Valve, showing the inlet and outlet ports.

Ọgụgụ 4: N'akuku view of the Berg Drain Valve, providing a comprehensive look at its design and connections.
Ntọala na nwụnye
This section outlines the general steps for installing the Berg Drain Valve. Always refer to the specific equipment's service manual for detailed, model-specific installation procedures.
- Nkwadebe: Ensure the system is powered off, depressurized, and completely drained of fluid. Place a suitable container to collect any residual fluid.
- Wepụ Valvụ Ochie (ọ bụrụ na ọdabara): Carefully disconnect any electrical connections and fluid lines from the existing drain valve. Remove mounting hardware and the old valve.
- Lelee mpaghara mgbago: Clean the mounting surface and inspect for any damage or debris. Ensure all seals and gaskets are clean and in good condition.
- Wụnye Valve ọhụrụ: Position the new Berg Drain Valve (Model 04.002.006) in the correct orientation. Secure it using the appropriate mounting hardware. Do not overtighten.
- Connect Fluid Lines: Reconnect the fluid inlet and outlet lines to the valve. Ensure connections are secure and leak-free.
- Jikọọ Eletriki: Reconnect the electrical wiring to the valve's terminals. Ensure proper polarity and secure connections.
- Mmegharị nrụgide sistemụ: Slowly re-pressurize the system and check for any leaks around the newly installed valve and connections.
- Nnwale arụ ọrụ: Perform a functional test of the drain valve as per the primary equipment's service manual to confirm proper operation.
Ntuziaka ọrụ
The Berg Drain Valve is typically controlled by the primary equipment's control system. Refer to your equipment's user manual for specific instructions on how to initiate the drain cycle.
- Ọrụ akpaaka: In most applications, the drain valve operates automatically as part of a programmed cycle (e.g., during a defrost cycle for ice machines).
- Mwepụ aka (ọ bụrụ na ọdabara): Some systems may offer a manual override for the drain valve. Consult your equipment's manual for details.
- Drainage Process: When activated, the valve opens to allow fluid to drain from the system. Ensure the drainage path is clear and directed to an appropriate waste receptacle.
Nlekọta
Regular maintenance ensures the longevity and proper function of your Berg Drain Valve. Always follow the maintenance schedule outlined in your primary equipment's service manual.
- Nyocha: Periodically inspect the valve for signs of wear, leaks, or corrosion. Check electrical connections for tightness and integrity.
- Nhicha: If accessible and recommended by the primary equipment manufacturer, clean the valve and surrounding area to prevent buildup of debris that could impede operation.
- Ndochi: Replace the drain valve if it shows signs of malfunction, such as continuous leaking, failure to open/close, or significant physical damage.
Nchọpụta nsogbu
This section provides general troubleshooting tips for common issues related to the drain valve. For complex problems, consult a qualified service technician.
| Nsogbu | Ihe nwere ike ime | Ngwọta |
|---|---|---|
| Valve not draining | No power to valve; Clogged drain line; Faulty valve; Control system issue. | Check electrical connections and power supply. Clear any obstructions in the drain line. Test valve for continuity. Consult equipment manual for control system diagnostics. |
| Valve continuously leaks | Debris in valve seat; Worn seals; Faulty valve. | Inspect valve for debris and clean if necessary. If seals are worn, valve replacement may be required. |
| Mkpọtụ na-adịghị ahụkebe sitere na valvụ | Vibration; Internal component issue. | Ensure valve is securely mounted. If noise persists, valve may need replacement. |
Nkọwapụta
| Njirimara | Nkọwa |
|---|---|
| Nọmba nlereanya | 04.002.006 |
| Ụdị | Berg |
| Ndakọrịta | Bim-350H, Bim-350F, Bim-529H, Bim-500F |
| Akụkụ ngwaahịa (L x W x H) | 9 x 6 x 5 sentimita asatọ |
| Ibu | 1 paụnd |
| Ụdị akụkụ | Ezigbo akụkụ nnọchi anya OEM |
Akwụkwọ ikike na nkwado
As a genuine OEM part, this Berg Drain Valve is typically covered under the warranty of the original equipment it is installed in. Please refer to the warranty documentation provided with your primary equipment for specific terms and conditions.
For technical support or inquiries regarding this part, please contact Berg customer service or the authorized dealer from whom you purchased your equipment. Ensure you have the model number (04.002.006) and the primary equipment's model information ready when contacting support.
Kedu ihe dị na igbe:
- 1 x Berg Drain Valve (Replacement Part)





