Amerec 9006-184

Amerec AI Series 9006-184 18KW Commercial Steam Boiler User Manual

Nle: 9006-184

1. Okwu mmalite

Thank you for choosing the Amerec AI Series 9006-184 18KW Commercial Steam Boiler. This manual provides essential information for the safe and efficient installation, operation, and maintenance of your steam generator. Please read this manual thoroughly before installation and retain it for future reference. Proper installation and maintenance are crucial for optimal performance and longevity of the unit.

2. Ozi nchekwa

ỊDỌ AKA NA NTỊ: Ọ bụrụ na anyị agbasoghị ntuziaka nchekwa ndị a, ọ ga-eme ka ọkụ eletrik, ọkụ, mmerụ ahụ dị njọ, ma ọ bụ ọnwụ.

3. Ngwaahịa gafereview

The Amerec AI Series 9006-184 is a high-performance 18KW commercial steam boiler designed for steam rooms ranging from 550 to 900 adjusted cubic feet (ACF). It features robust construction from corrosion-resistant steel and an ASME-certified pressure vessel for instant steam generation. Key components include durable electronic controls, a 3-level water sensing system with low water cutoff, and an electronic high-limit pressure control system.

Amerec AI Series 9006-184 18KW Commercial Steam Boiler

Figure 3.1: Amerec AI Series 9006-184 18KW Commercial Steam Boiler. This image shows the exterior of the steam boiler unit, highlighting its compact design and robust construction.

The unit is equipped with safety features such as a room high-limit temperature safety system, an ASME safety valve, and an alarm circuit panic button connection. It includes two 3/4 Inch NPT steam heads and is designed for hardwired installation.

4. Ntọala & nwụnye

4.1 Ndepụta nbanye tupu etinyere

4.2 Ịtinye Unit

The boiler is designed for floor installation. Select a level, stable surface capable of supporting the unit's weight (approximately 140 lbs). Ensure sufficient clearance around the unit for ventilation and maintenance access. Refer to the installation diagram (not pictured) for recommended clearances and mounting points.

4.3 Njikọ Plumbing

  1. Connect the water supply line to the designated inlet on the boiler. An inline shut-off valve and backflow preventer are recommended.
  2. Connect the 3/4 Inch drain port to an approved drainage system. Ensure proper slope for gravity drainage.
  3. Install the two 3/4 Inch NPT steam heads in the steam room according to the steam room design specifications. Connect the steam lines from the boiler to these heads.

4.4 Njikọ eletrik

Ọrụ eletrik niile ga-abụrịrị onye ọkụ eletrik nwere ikike ịrụ ya.

  1. Ensure the main power supply is OFF at the circuit breaker.
  2. Connect the 240V, 3 Phase power supply to the boiler's electrical terminal block (Electrical Location: Side).
  3. Properly ground the unit as per local electrical codes.
  4. Connect the optional D24/7 digital time clock and ADI-D Auto drain system if applicable.
  5. Connect the alarm circuit panic button if required.

5. Ntuziaka ọrụ

5.1 Mbido mbụ

  1. After installation, ensure all plumbing and electrical connections are secure and leak-free.
  2. Open the water supply valve to the boiler.
  3. Weghachite ike na unit dị na sekit mgbawa.
  4. The boiler will begin to fill with water. The 3-level water sensing system will monitor the water level.
  5. Once the appropriate water level is reached, the heating elements will activate, and steam production will begin.

5.2 Ọrụ nkịtị

The Amerec AI Series boiler is designed for automatic operation. Once powered on and filled, it will maintain steam production as needed. The electronic high-limit pressure control systems regulate the steam output.

5.3 Imechi nkeji

To shut down the unit, turn off the power at the main circuit breaker. If an optional D24/7 digital time clock is installed, it can be used to schedule on/off times.

6. Nlekọta

WARNING: Disconnect all power to the unit before performing any maintenance.

6.1 Nhicha mgbe niile

6.2 calhapụ ịda

Mineral deposits can accumulate inside the boiler, affecting efficiency. Descaling should be performed by a qualified technician. The frequency of descaling depends on water hardness and usage.

6.3 Nyocha kwa afọ

An annual inspection by a qualified service technician is recommended to check all components, including heating elements, sensors, safety valves, and electrical connections, to ensure continued safe and efficient operation.

7. Nchọpụta nsogbu

Tupu ịkpọtụrụ nkwado ndị ahịa, regharịaview nsogbu na ngwọta ndị a na-ahụkarị.

NsogbuIhe nwere ike imeNgwọta
Enweghị mmepụta uzuokuEnweghị ike ijikọ ọnụCheck circuit breaker. Ensure unit is properly wired.
Enweghị mmepụta uzuokuLow water level / Low water cut-off activatedEnsure water supply is open. Manually reset low water cut-off if necessary after verifying water level.
Enweghị mmepụta uzuokuHigh-limit pressure control activatedAllow unit to cool. Check for obstructions in steam lines or steam heads.
Nkeji na-agbapụta mmiriNjikọ ọkpọkọ mmiri dị nroTighten all plumbing connections. Inspect for damaged seals or pipes.
Steam room not hot enoughImproper room size for boiler capacityVerify steam room ACF is within the 550-900 range. Consult a professional if room is too large.

For issues not listed or if troubleshooting steps do not resolve the problem, contact Amerec customer support or a qualified service technician.

8. Nkọwapụta

NjirimaraNkọwa
Nọmba nlereanya9006-184
Mpụta ike18 kW
Voltage240V
Usoro3 Usoro
Ampoge88 Amps
Room Volume (ACF)550 - 900 C.F.
Ihe onwunweCorrosion-resistant Steel
Ụdị nwụnyeAla
Ibu140 lbs (Item Weight)
Akụkụ (L x W x H)17 1/2 Inch x 20 3/4 Inch x 23 1/4 Inch
Igbapu Port3/4 inch
Steam Heads IncludedTwo 3/4 Inch NPT
AsambodoASME Certified Pressure Vessel, UL Listed

9. Akwụkwọ ikike & Nkwado

9.1 Akwụkwọ ikike nwere oke

The Amerec AI Series 9006-184 Commercial Steam Boiler comes with a limited warranty. Please refer to the warranty card included with your product packaging for specific terms, conditions, and duration of coverage. The warranty typically covers defects in materials and workmanship under normal use and service.

9.2 Nkwado ndị ahịa

For technical assistance, parts, or warranty claims, please contact Amerec customer support. Have your model number (9006-184) and date of purchase ready when contacting support.

Amerec Customer Service:
Please visit the official Amerec website for current contact information, including phone numbers and email addresses.

Akwụkwọ ndị emetụtara - 9006-184

Tupuview Amerec AK Steam Generator nwụnye na ntuziaka ọrụ
Ntuziaka zuru oke maka ịwụnye na ije ozi Amerec AK usoro uzuoku ọkụ (AK4.5, AK6, AK7.5, AK9, AK11, AK14). Na-ekpuchi echekwabara nchekwa, mgbago, pọmpụ, wiring, nhọrọ njikwa na nnwale arụmọrụ. Na-agụnye nkọwa maka otu na multi-generator.
Tupuview Amerec Commercial Steam Generator Installation Instructions - Models AI 12-48
Comprehensive installation guide for Amerec AI series commercial steam generators (models AI 12, AI 18, AI 24, AI 30, AI 36, AI 42, AI 48). Covers setup, plumbing, electrical, and operation for large steam rooms.
Tupuview Amerec ComfortFlo Steam Head Installation Guide
Detailed installation instructions for the Amerec ComfortFlo steam head, covering steam line requirements, safety warnings, and step-by-step assembly for steam generators and boilers.
Tupuview Amerec AK Series Steam Generator nkọwapụta mpempe akwụkwọ
Mpempe akwụkwọ nkọwapụta zuru oke maka ndị na-emepụta uzuoku Amerec AK Series, na-ekpuchi atụmatụ arụmọrụ, nhọrọ njikwa (K60, KT60), nha na ntuziaka siri ike, ihe ọkụ eletrik na ọkpọkọ chọrọ, yana ntuziaka nwụnye.
Tupuview Amerec Steam Boiler Connections and Aroma Pump Installation Guide
Comprehensive guide detailing the boiler connections and installation of Amerec aroma therapy pumps for steam systems. Covers dual-room setups, control panel wiring, pump connections, and essential notes for proper setup.
Tupuview Amerec Steambath Generator Rough-In Sheet and Installation Notes
This document provides essential rough-in dimensions, connection details, and installation guidelines for Amerec steambath generators, including models AK4, AK10, AK12, AK14, and 3K series.